T&C/TAB
COMMISSIONING
Department
Commissioning for whole New
Construction Building
• Retro Commissioning for the
existing buildings.
• Operation and Maintenance
Manual
• T\C Projects time schedules
TESTING BALANCE
Department
• Performance Tests for all
HVAC equipment.
• Ducts and Pipes Balancing
Process.
• Temperature and RH
Measurements.
• Noise level and Vibration
Measurements.
VALIDATION
Department
• In door Air Quilty Test
• Laminar Flow Test.
• IQ & OQ Protocols.
ELECTRICAL
Department
• Power Quality Test
• Insulation Test.
• Thermographic Survey
Let’s Build Together!
Ready to Accelerate Your Construction Success? Partner with TUVcs Now!